• Grabthar@lemmy.world
    link
    fedilink
    arrow-up
    5
    ·
    2 days ago

    Or they know the state of the current airframes, and know we’ve already waffled on this to the point that any further changes are going to cause a delay that would result in a loss in operational capability, potentially for years. As much as I’d like to see us drop the F-35 on general principal, there is no magical fighter jet dealership where we can go pick something else up in any reasonable timeframe. We could accept the first batch and try cancelling the rest, to be replaced at some future date with something else, but for a small airforce like the RCAF, that presents operational challenges as well. I’d say renegotiate the deal. Get more jobs and a skilled workforce out of it. Lockheed is already offering, given the global drop in demand for their products. But for future purchases, we’re either going to have to make our own or buy European.